000 | 05483cam a2200865 a 4500 | ||
---|---|---|---|
001 | ocn607263785 | ||
003 | OCoLC | ||
005 | 20240523125531.0 | ||
006 | m o d | ||
007 | cr cnu---unuuu | ||
008 | 100415s2008 enka ob 001 0 eng d | ||
040 |
_aN$T _beng _epn _cN$T _dEBLCP _dBTCTA _dE7B _dOCLCQ _dDG1 _dMERUC _dOCLCQ _dDEBSZ _dUKDOC _dOCLCQ _dOCLCF _dYDXCP _dOCLCQ _dCOO _dOCLCQ _dDEBBG _dDG1 _dLIP _dBUF _dOCLCQ _dAU@ _dOCLCQ _dU3W _dOCLCQ _dOL$ _dOCLCQ _dS2H _dOCLCO _dOCLCQ _dOCLCO _dOCLCL |
||
019 |
_a500823625 _a520990453 _a536329991 _a647847849 _a1058205659 |
||
020 |
_a9780470394045 _q(electronic bk.) |
||
020 |
_a0470394048 _q(electronic bk.) |
||
020 | _a9780470611432 | ||
020 | _a047061143X | ||
020 | _z9781848210547 | ||
020 | _z184821054X | ||
024 | 7 |
_a10.1002/9780470611432 _2doi |
|
029 | 1 |
_aAU@ _b000058014391 |
|
029 | 1 |
_aCHNEW _b000935203 |
|
029 | 1 |
_aCHVBK _b48015547X |
|
029 | 1 |
_aDEBBG _bBV043391056 |
|
029 | 1 |
_aDEBSZ _b372598730 |
|
029 | 1 |
_aDEBSZ _b43080556X |
|
029 | 1 |
_aDEBSZ _b484981765 |
|
029 | 1 |
_aNZ1 _b14695664 |
|
029 | 1 |
_aNZ1 _b15340900 |
|
029 | 1 |
_aAU@ _b000055728688 |
|
035 |
_a(OCoLC)607263785 _z(OCoLC)500823625 _z(OCoLC)520990453 _z(OCoLC)536329991 _z(OCoLC)647847849 _z(OCoLC)1058205659 |
||
037 |
_a10.1002/9780470611432 _bWiley InterScience _nhttp://www3.interscience.wiley.com |
||
041 | 1 |
_aeng _bfre |
|
050 | 4 |
_aTS157.5 _b.F55 2008eb |
|
072 | 7 |
_aTEC _x018000 _2bisacsh |
|
072 | 7 |
_aTEC _x009060 _2bisacsh |
|
072 | 7 |
_aBUS _x087000 _2bisacsh |
|
082 | 0 | 4 |
_a658.5/3 _222 |
049 | _aMAIN | ||
245 | 0 | 0 |
_aFlexibility and robustness in scheduling / _cedited by Jean-Charles Billaut, Aziz Moukrim, Eric Sanlaville. |
260 |
_aLondon ; _aHoboken, NJ : _bISTE/John Wiley & Sons, _c2008. |
||
300 |
_a1 online resource (349 pages) : _billustrations |
||
336 |
_atext _btxt _2rdacontent |
||
337 |
_acomputer _bc _2rdamedia |
||
338 |
_aonline resource _bcr _2rdacarrier |
||
490 | 1 | _aControl systems, robotics and manufacturing series | |
504 | _aIncludes bibliographical references and index. | ||
505 | 0 | _aIntroduction to flexibility and robustness in scheduling -- Robustness in operations research and decision aiding -- The robustness of multi-purpose machines workshop configuration -- Sensitivity analysis for One and m machines -- Service level in scheduling -- Metaheuristics for robust planning and scheduling -- Metaheuristics and performance evaluation models for the stochastic permutation flow-shop scheduling -- Resource allocation for the construction of robust project schedules -- Constraint-based approaches for robust scheduling -- Scheduling operation groups: a multicriteria approach to provide sequential flexibility -- A flexible proactive-reactive approach: the case of an assembly workshop -- Stabilization for parallel applications -- Contribution to a proactive/reactive control of time critical systems -- Small perturbations on some NP-complete scheduling problems. | |
520 | _a"Scheduling is a broad research area and scheduling problems arise from several application domains (production systems, logistic, computer science, etc.). Solving scheduling problems requires tools of combinatorial optimization, exact or approximated algorithms. Flexibility is at the frontier between predictive deterministic approaches and reactive or on-line approaches. The purpose of flexibility is to provide one or more solutions adapted to the context of the application in order to provide the ideal solution. This book focuses on the integration of flexibility and robustness considerations in the study of scheduling problems. After considering both flexibility and robustness, it then covers various scheduling problems, treated with an emphasis on flexibility or robustness, or both."--Publisher's description. | ||
546 | _aTranslated from the French. | ||
588 | 0 | _aPrint version record. | |
590 |
_aJohn Wiley and Sons _bWiley Online Library: Complete oBooks |
||
650 | 0 | _aProduction scheduling. | |
650 | 6 | _aOrdonnancement (Gestion) | |
650 | 7 |
_aTECHNOLOGY & ENGINEERING _xIndustrial Technology. _2bisacsh |
|
650 | 7 |
_aTECHNOLOGY & ENGINEERING _xIndustrial Engineering. _2bisacsh |
|
650 | 7 |
_aBUSINESS & ECONOMICS _xProduction & Operations Management. _2bisacsh |
|
650 | 7 |
_aProduction scheduling _2fast |
|
700 | 1 |
_aBillaut, Jean-Charles, _d1967- _1https://id.oclc.org/worldcat/entity/E39PCjBmvdmygHD6Vhq8DtrMKd |
|
700 | 1 | _aMoukrim, Aziz. | |
700 | 1 | _aSanlaville, Eric. | |
758 |
_ihas work: _aFlexibility and robustness in scheduling (Text) _1https://id.oclc.org/worldcat/entity/E39PCGY4Fm3YvdY8fYhwpBPpHd _4https://id.oclc.org/worldcat/ontology/hasWork |
||
776 | 0 | 8 |
_iPrint version: _sFlexibilit�e et robustesse en ordonnancement English. _tFlexibility and robustness in scheduling. _dLondon ; Hoboken, NJ : ISTE/John Wiley & Sons, 2008 _z9781848210547 _w(DLC) 2008030722 _w(OCoLC)228359975 |
830 | 0 | _aControl systems, robotics and manufacturing series. | |
856 | 4 | 0 | _uhttps://onlinelibrary.wiley.com/doi/book/10.1002/9780470611432 |
938 |
_a123Library _b123L _n21810 |
||
938 |
_aBaker and Taylor _bBTCP _nBK0008736593 |
||
938 |
_aEBL - Ebook Library _bEBLB _nEBL477629 |
||
938 |
_aebrary _bEBRY _nebr10360944 |
||
938 |
_aEBSCOhost _bEBSC _n310792 |
||
938 |
_aYBP Library Services _bYANK _n3134068 |
||
938 |
_aYBP Library Services _bYANK _n3161068 |
||
938 |
_aYBP Library Services _bYANK _n12673000 |
||
994 |
_a92 _bINLUM |
||
999 |
_c11444 _d11444 |