NLU Meghalaya Library

Online Public Access Catalogue (OPAC)

Amazon cover image
Image from Amazon.com

Cost-benefit analysis / Per-Olov Johansson and Bengt Kriström.

By: Contributor(s): Material type: TextSeries: Elements in public economics | Cambridge elementsPublisher: Cambridge : Cambridge University Press, 2018Description: 1 online resource (iv, 94 pages) : digital, PDF file(s)Content type:
  • text
Media type:
  • computer
Carrier type:
  • online resource
ISBN:
  • 9781108660624 (ebook)
Subject(s): Additional physical formats: Print version: : No titleDDC classification:
  • 658.1554 23
LOC classification:
  • HD47.4 .J64 2018
Online resources: Summary: This Element on cost-benefit analysis provides a summary of recent theoretical and empirical developments and summarizes state-of-the-art stated-preference and revealed-preference valuation methods. The Element discusses how to assess small (or marginal) as well as large (or non-marginal) projects that have a significant impact on prices and/or other economic variables. It also discusses distortions like taxes, market power, and sticky prices. In addition, risk/uncertainty is considered. A novel feature is the elaboration on flexible evaluation rules for reasonably small projects. Conventional point-estimates of projects should be used with care, because they typically give biased results.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Status Barcode
eBooks Central Library Economics Available EB0253

Title from publisher's bibliographic system (viewed on 29 May 2018).

This Element on cost-benefit analysis provides a summary of recent theoretical and empirical developments and summarizes state-of-the-art stated-preference and revealed-preference valuation methods. The Element discusses how to assess small (or marginal) as well as large (or non-marginal) projects that have a significant impact on prices and/or other economic variables. It also discusses distortions like taxes, market power, and sticky prices. In addition, risk/uncertainty is considered. A novel feature is the elaboration on flexible evaluation rules for reasonably small projects. Conventional point-estimates of projects should be used with care, because they typically give biased results.

There are no comments on this title.

to post a comment.